Building & renovation
Heizungstausch in a WEG: what the new heating law (GModG) means in Nuremberg

Short answer
The 65 per cent rule for new heating is gone. Since 29 July 2026, the Building Modernisation Act (GModG) allows owners’ associations to install gas or oil boilers again. Boilers installed after that date must use rising shares of climate-friendly fuels from 2029: 10 per cent, rising to 60 per cent by 2040. Existing systems are exempt.
Switching pack for your owners’ meeting Request the pack
What changed in summer 2026
Under the previous Building Energy Act (GEG), the 65 per cent rule would have applied in large cities such as Nuremberg from 1 July 2026: newly installed heating systems would have had to run on at least 65 per cent renewable energy. That never happened. The deadline was first postponed, and on 10 July 2026 the Bundestag and Bundesrat passed the Building Modernisation Act (Gebäudemodernisierungsgesetz, GModG). It was promulgated on 28 July; the main new rules have applied since 29 July 2026.
The GModG is the renamed and restructured Building Energy Act. The key change for owners: the blanket 65 per cent requirement has been scrapped without replacement. The choice of heating technology lies with the owners again — heat pump, district heating, biomass, hybrid, or a new gas or oil boiler.
In its place, the bio-fuel staircase (Bio-Treppe, § 43 GModG) applies to new fossil-fuel systems. Anyone who installs a gas, oil or LPG heating system after 29 July 2026 must, from 2029, use a rising share of climate-friendly fuels such as biomethane, bio-oil or hydrogen:
- New heating law (GModG) in force
- since 29 July 2026
- Bio-fuel staircase from 1 January 2029
- at least 10%
- from 1 January 2030
- at least 15%
- from 1 January 2035
- at least 30%
- from 1 January 2040
- at least 60%
- Systems installed before 29 July 2026
- not affected
For a WEG, this means: a new gas boiler is legally possible again, but not as cheap as the quoted price suggests. Biomethane costs considerably more than natural gas, and the required share rises to 60 per cent over the life of the system. Buying a boiler for twenty years today means buying into that price trend. Funding for climate-friendly heating (BEG) continues with adjustments, according to the federal government; the funding rates are due to fall gradually from 2027. If you have to replace anyway, check the current position before planning.
What Nuremberg’s heat plan still means
The Heat Planning Act (WPG) requires municipalities with more than 100,000 inhabitants to present a municipal heat plan by 30 June 2026; smaller municipalities have until mid-2028. Nuremberg finished early: the city council adopted its heat plan on 4 June 2025, drawn up together with the utility N-ERGIE (information from the City of Nuremberg).
With the 65 per cent rule gone, the heat plan no longer triggers any installation deadline. That does not make it worthless — quite the opposite. It is now the most important decision aid for the question of which technology will work at a given location in the long term.
The heat plan divides the city into supply areas. In densely built-up areas, especially in the centre, the district heating network is to be expanded and densified; district heating currently covers around a quarter of Nuremberg’s heating demand. In less dense areas, decentralised solutions such as heat pumps become more important.
This is strategic planning, not a promise. Being designated a future district heating area does not give you a right to a connection by any particular date. For a WEG whose boiler will be due in three years, the decisive question is therefore not what the plan foresees but what the network operator commits to for the specific address and the specific period. That information should be in writing before the owners decide.
For properties in Fürth, Erlangen and the surrounding municipalities, check the respective municipality — some have not yet completed their heat planning.
The decision in the owners’ association
The heating system is part of the common property. The owners decide on replacing it, not the property manager — WEG management prepares the resolution and implements it.
Maintenance or structural alteration? Replacing an existing system with a new one that does the same job is maintenance — a simple majority of the votes cast is enough, and there is no quorum. If noticeably more is added, for example a district heating connection with a transfer station where there used to be a boiler, or a heat pump that involves work on the façade and outdoor areas, it can be a structural alteration under § 20 WEG. The cost rules of § 21 WEG then apply — what that means is explained in our article on structural alterations. Settle this distinction before the meeting, not in the argument afterwards.
Cost allocation for maintenance follows the community rules (Gemeinschaftsordnung), unless the owners have resolved otherwise. A different allocation key for individual costs is possible under § 16(2) WEG, but must be expressly resolved.
The choice of technology is once again a genuine trade-off for the owners. That is exactly why the resolution needs a cost-effectiveness calculation that includes the bio-fuel staircase and rising CO₂ prices — otherwise the quote with the lowest installation price wins at the meeting, not the one with the lowest costs over twenty years.
A realistic timeline
12–18 months before
Establish condition and remaining life
Age and condition of the system, chimney sweep reports, consumption figures. In parallel, ask the network operator about district heating availability at the specific address.
9–12 months before
Commission specialist planning
An energy consultant or specialist planner compares the realistic options with investment and running costs over 20 years — for fossil options including the extra fuel costs of the bio-fuel staircase.
6 months before
Check funding
Funding conditions were adjusted with the new law. Check the current position shortly before applying, and apply before awarding the contract — funding is usually lost if you apply afterwards.
Owners’ meeting
Resolution on the work and the financing
Option, cost ceiling, allocation key, financing from the reserve or a special levy — in one package of resolutions, so the work is not approved while the financing is missing.
Implementation
Contract award and site supervision
At least three quotes based on an identical specification. For larger projects, separate construction supervision is worthwhile; its cost belongs in the resolution.
Financing: reserve, special levy or loan
If the maintenance reserve (Erhaltungsrücklage) is enough, it is simple: resolve on the withdrawal and show it separately in the annual statement. In most associations it is not enough. Whether your reserve matches the need is shown by the maintenance reserve calculator.
Then a special levy (Sonderumlage) and a loan to the association are the two options. The special levy is quicker and cheaper but hits everyone at once and causes liquidity problems for some owners — which the others then help to carry. The loan spreads the burden, costs interest and requires a carefully worded resolution, because the owners are liable to creditors in proportion to their co-ownership shares (§ 9a(4) WEG).
For owners who let their flat, a modernisation rent increase under § 559 BGB may be possible if the work goes beyond mere maintenance. The share attributable to maintenance must be deducted — and the association’s accounts must make exactly that split possible. With the GModG, the legislator has also split the running costs of new fossil-fuel heating between tenant and landlord (§§ 5a ff. CO2KostAufG): for gas, oil and LPG systems installed after 29 July 2026, the landlord bears half of the CO₂ costs and gas network charges from 2028, and from 2029 half of the extra costs for the bio share, capped at 30 per cent of the fuel. In an association with many letting owners, that shifts the calculation significantly: for them, a new gas boiler is more expensive than its running costs suggest. Have a planned rent increase checked in advance.
The most common mistake
Starting too late. A WEG whose boiler fails in January has no time for specialist planning, comparing quotes, a funding application and a properly convened owners’ meeting. It makes a makeshift repair or, under pressure, resolves on the option with the lowest installation price — which under the new law is no longer automatically the cheapest. If you track the system’s remaining life in a maintenance plan, you have this discussion three years before it fails. The plan, tendering and checking quotes are part of technical management.
For the associations it manages, Ravenica keeps a maintenance plan with remaining useful lives and supports maintenance work from specialist planning through to acceptance.
Frequently asked questions
Has the 65 per cent rule applied in Nuremberg since July 2026?
No. It would have applied in large cities from 1 July 2026, but was first postponed and then scrapped by the Building Modernisation Act (GModG). The new law has applied since 29 July 2026. There is no longer an obligation to use 65 per cent renewable energy when replacing a heating system.
Can we install a new gas boiler again?
Yes. For gas, oil and LPG heating installed after 29 July 2026, however, the so-called bio-fuel staircase (Bio-Treppe, § 43 GModG) applies: at least 10 per cent climate-friendly fuels from 2029, 15 per cent from 2030, 30 per cent from 2035 and 60 per cent from 2040. These extra costs belong in the cost-effectiveness calculation — and owners who let their flat bear half of them themselves.
Do I have to replace my working gas boiler?
No. Existing systems may continue to be operated and repaired, and the bio-fuel staircase does not apply to systems installed before 29 July 2026. The new law has also abolished the requirement to replace boilers after 30 years and the end date for fossil-fuel boilers at the end of 2044.
Is there an obligation to connect to district heating (Fernwärme) in Nuremberg?
No general obligation to connect is currently planned. The municipal heat plan divides the city into supply areas and shows where district heating may be available in future — but it does not oblige anyone to connect.
What majority does a heating replacement need in a WEG?
Replacing a heating system that is part of the common property is as a rule a maintenance measure and is resolved by a simple majority of the votes cast. Only if the work goes beyond replacement and modernises can it count as a structural alteration with its own cost rules.
Can the maintenance reserve be used for the new heating?
Yes, to the extent that an existing system in the common property is being renewed. Drawing on the reserve requires a resolution and must be shown separately in the annual statement.